A worked example
Twenty ceiling speakers on their 4 W taps and six corridor horns on 8 W. Twenty fours is 80 W and six eights is 48 W, so the line carries 128 W. That is the whole calculation — on a constant-voltage line the load is addition, which is why these systems scale to a building.
With 20% held back you want an amplifier of at least 153.6 W. A 200 W amplifier covers it at 64% of its rating, leaving 72 W and room for 9 more 4 W speakers before the reserve is gone.
A 150 W amplifier is the case worth looking at: the 128 W load fits inside it with 22 W to spare, and it still does not pass here, because 153.6 W is what the load plus reserve asks for. An amplifier run at its rating has nowhere to go when somebody pages over music.
This is the 70 volt kind, not the 8 ohm kind
Constant-voltage distribution puts a transformer on every speaker and a fixed voltage on the line. You choose how much power each speaker takes with its tap, the amplifier sees the sum, and adding a speaker adds its tap to the total. That is what makes it the right choice for paging and background music across a building.
Low-impedance wiring — the 4 and 8 ohm kind, as in a conference room with two speakers on a small amplifier — does not work this way at all. There you are matching impedance, speakers in parallel lower the load the amplifier sees, and summing wattages tells you nothing useful. Mixing the two models up is the classic mistake, so this calculator has no impedance input: if you are thinking in ohms, this is the wrong page.
Why the line voltage matters, and why it is not in the load
The tap sum does not depend on the line voltage. The current does, and that is what the cable feels:
| Line voltage | Load | Current on the line |
|---|---|---|
| 25 V | 128 W | 5.12 A |
| 70.7 V | 128 W | 1.81 A |
| 100 V | 128 W | 1.28 A |
Same speakers, same watts, and 4.0 times the current at 25 V as at 100 V. More current is more loss in the cable and more heat in the bundle, which is the argument for the higher line voltage on a long run. The voltage drop calculator takes that current.
What this does not tell you
- Nothing about how it will sound. Tap settings set power, not coverage. How loud a room is depends on speaker spacing, ceiling height, what the room is made of and how much noise is already in it.
- Transformer insertion loss is not modelled. A line transformer gives back slightly less than its tap, so the acoustic result is a little under the arithmetic.
- The reserve is a convention, not a rule. 20% is the figure commonly left spare and it is the default here, but it is adjustable because it is a judgement. Nothing on this page is a code requirement.
- It says nothing about the cable. A long run at a low line voltage loses level as well as power, and a 25 V system is more sensitive to that than a 100 V one.
- Nothing here covers life-safety notification. Voice evacuation and fire alarm notification appliance circuits are a separate discipline with their own requirements, and this is a paging and background-music tool.
Paging or background music to install?
We design and install communication systems across Illinois, including distributed audio and intercom, alongside the alarm and access systems they usually sit next to.
Other tools
- Voltage dropHow much voltage a run loses, and how much reaches the device at the end of it.
- Wire sizeThe smallest conductor that still gets the device enough voltage.
- PoE budgetWhat a set of cameras and door controllers asks of the switch feeding them.
- CCTV storageHow much disk a retention period needs, and how long an array will last.
- CCTV bandwidthWhat the cameras ask of the switch, recording and while being watched.
- RAID capacityWhat an array really gives you, and how many disks can fail.
- Conduit fillWhether the cable you are pulling fits the conduit, and how much room is left.
- Resistor colorsWhat the bands mean, and which resistor a supervised zone wants.
- Ohm's lawAny two of volts, amps, ohms and watts give the other two.
- IP subnetWhat a prefix really holds, and how to carve one up by system.
- Address planThe commissioning address list, before you are up a ladder.
