A worked example
Twelve Class 4 cameras and two Class 6 door controllers. The cameras draw 25.50 W each and the controllers 51.00 W each, which comes to 408 W of device load. It is tempting to size the switch against that number, and it is the wrong one.
The switch has to supply 480 W, because the PSE figure includes the worst-case loss in the cable: the switch pushes power in at one end and some of it becomes heat before it arrives. Put these fourteen devices on a switch with a 450 W PoE budget and they do not fit — that is 107% committed, short by 30 W. Judged by the device figure alone, the same install would have looked like it had 42 W to spare.
The same fourteen devices on a 600 W switch, which is where the calculator above starts, do fit: 80% committed with 120 W left. Nothing about the devices changed — only which number the switch was chosen against.
Type is not class
This is the mistake that costs an afternoon. Type describes what a port can do; class describes what a device asks for, and they do not line up one to one. Type 3 covers Classes 1 to 6, and Type 4 covers Classes 7 and 8. So a "Type 3 port" might be feeding a Class 5 device at 45 W rather than a Class 6 device at 60 W. Budget by class, and read the class off the device's data sheet rather than inferring it from the switch.
Why these numbers differ from the ones you remember
802.3af is usually quoted as 15.4 W at the switch and 12.95 W at the device. Under IEEE 802.3bt the same Class 3 is 14.00 W and 13.00 W, because bt recalculated the cable-loss allowance. Neither figure is wrong; they belong to different standards, and mixing them is how a budget ends up a few watts out per port. Everything on this page is IEEE 802.3bt.
- 802.3af: 15.4 W PSE / 12.95 W PD (Type 1, Classes 0 to 3).
- 802.3at: 30 W PSE / 25.5 W PD (Type 2, Class 4).
Power by class
PD is what the device gets; PSE is what the switch has to put in. Budget against the PSE worst case.
| Class | Type | PD average | PD peak | PSE worst case | PSE peak |
|---|---|---|---|---|---|
| 1 | 1 | 3.84 W | 5.00 W | 4.00 W | 5.47 W |
| 2 | 1 | 6.49 W | 8.36 W | 6.70 W | 8.87 W |
| 3 | 1 | 13.00 W | 14.40 W | 14.00 W | 16.07 W |
| 4 | 2 | 25.50 W | 28.30 W | 30.00 W | 34.12 W |
| 5 | 3 | 40.00 W | 42.00 W | 45.00 W | 47.68 W |
| 6 | 3 | 51.00 W | 53.50 W | 60.00 W | 63.62 W |
| 7 | 4 | 62.00 W | 65.10 W | 75.00 W | 79.83 W |
| 8 | 4 | 71.30 W | 74.90 W | 90.00 W | 96.36 W |
Where these figures come from
Ethernet Alliance, Overview of 802.3bt Power over Ethernet, April 2018, Tables 3 and 13, which is free to read. For normative text, IEEE 802.3bt Clause 145.
One caution worth repeating: that paper predates final publication of the standard. The figures have been stable since, but if a number here is going into a submittal, confirm it against the published standard rather than against this page.
What this does not tell you
- It budgets power, not heat. A switch running near its PoE limit in a closed cabinet is a thermal problem before it is an electrical one.
- It assumes every device draws its class maximum. Many draw less in normal operation and all of them draw more at startup, so a budget with no headroom will hold on paper and fail when the power comes back after an outage.
- It says nothing about cable. Class 5 and above over thin or long patch cable is where PoE installations actually come unstuck; see the voltage drop calculator for the conductor side of it.
- Class 0 is not offered here. It is a legacy default meaning "unclassified", which a budget cannot do anything useful with; treat an unclassified device as Class 3 until its data sheet says otherwise.
Other tools
- Voltage dropHow much voltage a run loses, and how much reaches the device at the end of it.
- Wire sizeThe smallest conductor that still gets the device enough voltage.
- CCTV storageHow much disk a retention period needs, and how long an array will last.
- CCTV bandwidthWhat the cameras ask of the switch, recording and while being watched.
- RAID capacityWhat an array really gives you, and how many disks can fail.
- Conduit fillWhether the cable you are pulling fits the conduit, and how much room is left.
- Resistor colorsWhat the bands mean, and which resistor a supervised zone wants.
- Ohm's lawAny two of volts, amps, ohms and watts give the other two.
- Speaker loadWhether the amplifier covers the taps, with reserve left over.
- IP subnetWhat a prefix really holds, and how to carve one up by system.
- Address planThe commissioning address list, before you are up a ladder.